Architecture Hall - University of Washington, Seattle, WA

Architecture Hall - University of Washington, Seattle, WA
Start Date:

September 2005

Completion Date:

Scheduled for 2010

Project Description: Total renovation of 50,000 SF historic building with classrooms, faculty offices, studios, and exhibit space. Designed to meet LEED "Silver" criteria.

Systems Commissioned: HVAC: steam system, steam to heating water converter, heating water distribution, chilled water distribution, pressure relief devices, AHU's and distribution systems, air terminal units, misc. supply and exhaust fans, air conditioning units and variable frequency drives. Plumbing: domestic hot water recirculation system and trap primer systems. Controls: DDC sequences of operation, graphics, sensors and calibration, trend logging, report generation, alarm generation, remote access, security password access, control loop stability, system under loss of power and recover. Unitary Controls: sequences of operation and alarming, loop stability and safety features. HVAC/Fire Alarm system Interfaces: combination fire/smoke dampers, HVAC system response, recovery of HVAC fan systems. Electrical Systems: review record sheets provided by the test engineer, verify uninterruptible power system.

Commissioning Scope: Focused review of design documents, development of commissioning specifications, commissioning of all major mechanical and electrical systems, development of re-commissioning manual, and participation in owner training.

KBA Role: Prime commissioning agent

KBA Project Manager: Jeremy Fugere, LEED AP, ACG CxA

Project Reference: Mark Sweeters, University of Washington, (206) 221-4401

Back to project experience page

Keithly Barber Associates
Burien Office
14237R Ambaum Blvd. SW
Burien, WA 98166

Ph: 206.835.8254
Fax: 206.246.1691

 

 

 

Keithly Barber Associates
San Francisco Office
332 Pine Street, Ste 307
San Francisco, CA 94104

Ph: 415.788.0211