Island Hospital

Island Hospital Renovation & Addition - Island Hospital, Anacortes, WA
Start Date:

May 2006

Completion Date:

Scheduled for 2010

Project Description: Two-story, 55,000 square-foot building addition and a 10,000 square foot renovation.

KBA Scope: Commissioning of a central building automation system (Energy Management System), heating, ventilation and air conditioning systems, equipment & components, verification that the egress pressurization is in accordance with the owner's project requirements, basis of design, and construction documents; as well as verification of electrical panel schedules, domestic water and process pumping, and mixing controls and hydronic balancing. The scope also includes verification of the Noise Criteria in patient rooms in accordance with the owner's project requirements and the basis of design.

KBA Role: Prime commissioning agent.

KBA Project Manager: Ryan Hay, PE, LEED AP, ACG CxA

Project Reference: Marc Estvold, Owner's Project Manager, Island Hospital, (360) 299-1805

Back to project experience page

Keithly Barber Associates
Burien Office
14237R Ambaum Blvd. SW
Burien, WA 98166

Ph: 206.835.8254
Fax: 206.246.1691

 

 

 

Keithly Barber Associates
San Francisco Office
332 Pine Street, Ste 307
San Francisco, CA 94104

Ph: 415.788.0211